Heartland Pipelines was one of the first companies in the UK to successfully install a ductile iron (DI) pipeline using horizontal directional drilling (HDD) – a landmark project that demonstrated our ability to deliver complex, innovative trenchless installations.
The challenge
Ductile iron offers exceptional strength and longevity for high-pressure water mains, but its weight and jointing make it far more challenging to install by HDD than conventional polyethylene pipe. Completing a DI installation trenchlessly required careful bore design, accurate steering and close control of the pull-back.
The solution
Our experienced drilling teams designed and executed the bore, managing ground conditions and pull-back forces to install the ductile iron main with minimal surface disruption – avoiding the extensive excavation that open-cut installation would have required.
The result
A successful, durable ductile iron pipeline installed by HDD, and a capability that continues to set Heartland Pipelines apart for demanding water infrastructure projects. Explore our ductile iron HDD service.
Learn more about our directional drilling services or contact our team on 01952 260505 to discuss your project.